Local
Mumbai's Ghatkopar ROB Design Changed Midway; 3 Pier Caps To Be Partially Demolished, Rebuilt After 30% Work Done
Summary by The Mumbai Editorial Desk · As published by Free Press Journal
· October 6, 2026
· 1 min read
Photo: Free Press Journal · view original
Story provenance No corrections
Summary created by The Mumbai Editorial Desk — automated, rule-governed Published by Free Press Journal Original story Read at the source Source published Oct 6, 2026 Indexed here Oct 6, 2026 AI assistance Automated summary drawn from the source’s own published text Prepublication human review No — editorial rules, flagged-item review, and published samples
Every story comes with a passport. How we work · Corrections log
Key points This change is being made after about 30 per cent of the work was completed. The pier caps affected by the change are identified as R, RP16, and RP.
Construction of a road overbridge is undergoing a design change. The revision involves partially demolishing and rebuilding three pier caps at a higher level. This change is being made after about 30 per cent of the work was completed.
The revised plan includes a two-tier arrangement for the bridge. A lower level will be for local traffic, while the main bridge will be raised and widened to handle through traffic. The pier caps affected by the change are identified as R, RP16, and RP.
Further details on the revised plan are available, including the expected outcome of the design change and its impact on traffic flow.
More Local Today’s briefing Local events
Why this story is here
Free Press Journal reported and published this story. The Mumbai selected it, summarised the key facts above, and links to the original. We did not report this story and we added no reporting of our own to it.
About this story
As published by Free Press Journal . The Mumbai selects stories from publishers’ feeds, summarises them, and links back to the publisher that reported them. We add no reporting of our own. We attribute every source, link to the original report, and follow a documented editorial standards policy. To understand how stories are selected and reviewed, read our about page .
For the complete original report, visit Free Press Journal . Have a tip or correction? Contact the editor .
Category: Local ·
Published: October 6, 2026 ·
Source: Free Press Journal ·
Reading time: 1 min
Frequently asked about this story
What is this story about? Construction of a road overbridge is undergoing a design change. The revision involves partially demolishing and rebuilding three pier caps at a higher level. This change is being made after about 30…
When was this published? This article was first published on October 6, 2026 by Free Press Journal and curated for The Mumbai readers.
Who reported this story? This story was reported by Free Press Journal. To learn more about how The Mumbai selects and reviews stories, see our editorial standards .
Where can I find related coverage? See more Local coverage from The Mumbai, or browse our daily briefing and topic hubs .
← Back to all news
More Local →
Today’s briefing
Subscribe to newsletter