A transportation system's return to service is being delayed. The cause of the delay is the potential installation of protective measures. These measures are intended to catch loose material that could fall from elevated tracks.

The system was previously shut down for nearly a year and its revamped system was deemed safe for passengers about three months ago. However, services have yet to resume.

Further information on the expected timeline and details of the installation can be found in a report from Maha Mumbai Metro Operation Corporation Limited, a subsidiary of the Metropolitan Region Development Authority.