Skip to content
The Mumbai

Space crunch at CSMT slows down CR’s platform extension for 15-car trains

Space crunch at CSMT slows down CR’s platform extension for 15-car trains
Photo: Hindustan Times — Mumbai · view original

To expand the carrying capacity from 12-car to 15-car, two more platforms need to be extended by around 45-50 metres.

Sources and story details