A structural audit found critical components of four foot over bridges to be deteriorated and corroded. This has led to their closure to pedestrians due to safety concerns. The affected bridges are located at Masjid and Matunga stations.

The decision to close them comes at a time when a significant increase in crowd is expected. A joint inspection was conducted by officials, which led to the submission of a structural audit report.

Further information about the closures and the audit report is available from the source. The bridges in question include those near specific roads and schools, with details of their locations and conditions provided in the report.